Outage work order verification: fault reports, crew actions and restoration checks to keep through an outage system migration

Short answer

Before an outage system migration, inventory the three records that prove whether a restoration actually held: the fault reports that opened each event, the crew actions and work order closures, and the restoration checks (callbacks, meter readings, field confirmation) that verified customers were back. Note which system holds each, the years covered, who owns them and the migration cutover date. Then introduce the operations director and identify who can authorize a data discussion; licensing depends on rights, qualification and the proposed use.

Visual briefFull-size diagram
Split panel: the network model and open events move to the new outage platform, while closed events, partial restoration links, callbacks and meter checks, and work order links stay on the old platform.
Illustrative migration scope for a fictional distribution utility; the left-behind side is what an inventory should name before cutover.

Verification is the step that separates "the crew closed the job" from "every customer on that circuit had power again." The two can differ, which is why a utility's history of checked restorations is worth knowing about before its platform changes.

What should be inventoried before an outage system migration affects outage work order verification history?

Five record classes across at least two systems, and the dates that bound them. The particular risk is that the new outage platform imports the network model and open events, while closed events, their partial restorations and the links to work orders in the asset system stay behind.

Record classTypical systemAsk aboutWhy it matters for verification
Fault reports and trouble callsOutage platform, call center or IVRYears kept; whether calls stay linked to eventsShows who reported what, and when
Event history with predicted deviceOutage platformWhether closed events migrate with their historyShows what the system thought had failed
Crew actions and work ordersOutage platform and asset or work management systemHow the two are linked; who closes the work orderShows what the crew did and when they called it done
Restoration checksCallback logs, meter event data, field notesWhether checks are stored or only acted onShows whether every customer was actually back
Partial restoration and nested event linksOutage platformWhether parent and child events keep their relationshipShows what a single closure hid

Ask the operations director, at metadata level only:

  1. How many years of closed outage events does the current platform hold, and how far back do work order links go in the asset system?
  2. Will the migration bring over closed events with their partial restoration history, or summary records only?
  3. Are callbacks and meter event data retained after an event closes, and for how long?
  4. Who closes a work order: the crew, the dispatcher or the system on restoration?
  5. Are any verification steps recorded only in radio logs, spreadsheets or crew notes?
  6. When does read access to the old platform end?

Partners collect answers, never exports, network maps or logins, and never recommend keeping data the company has no authority to keep. The asset side of a similar migration is covered in CMMS migration.

Why closed events are the history most at risk

An outage platform exists to manage the next storm. Its migration is judged by whether the network model is right and open events carry over cleanly on cutover night. Closed events are a reporting concern, and reporting is usually handled by a summary extract.

The structure of the history is what a summary loses. Outage management systems model restoration as a set of related events, not one ticket: Oracle's Network Management System user guide, for example, has procedures for copying event details to related partial restoration events, updating multiple events and completing an event. When those relationships are flattened, a single "restored" timestamp replaces the record of which customers came back when.

That matters beyond any data discussion. Utilities report reliability through indices built from interruption history. Form EIA-861 asks for SAIDI and SAIFI both including and excluding major events, counts sustained interruptions of over 5 minutes, and records SAIDI in minutes. Under the IEEE 1366 method, a major event day is one whose daily SAIDI exceeds a threshold, so storms can be studied separately from normal operation. The figures a utility filed in past years were computed from event records like these, which is one reason the operations team may already care how the history migrates.

An illustrative inventory sheet

Illustrative only; the utility and figures are fictional. A 520-person electric distribution cooperative is replacing its outage platform before next storm season. The operations director fills in the sheet from the project plan in one meeting, without opening any event.

Record classSystemYears heldOwnerMoves at cutover?Readable until
Trouble callsIVR and call center platform2016 to nowMember services managerNot affectedCall platform kept
Event historyOutage platform2014 to nowOperations directorOpen events onlyOld platform license end
Partial restoration linksOutage platform2014 to nowOperations directorNoOld platform license end
Work ordersWork management system2012 to nowAsset management leadNot affectedWork system kept
Callbacks and meter checksOutage platform, meter data system2018 to nowOperations director, meteringSummary onlyMeter data retention rule

Reading the sheet: calls and work orders are safe because those systems stay. The event relationships, which are what show a closure that hid customers still out, depend on the old platform license, and that date belongs in the handoff.

Which date is the real deadline?

The day read access to the old outage platform ends, from the license or the decommission plan, not the cutover night. Some projects keep the old system readable for a period after cutover so results can be compared; ask whether that is planned and for how long. Add the retention rule for meter event data, which may be shorter than either. If no date is fixed, record "not set" rather than guessing.

Who decides, and does the company qualify?

The operations director knows coverage. The CEO, COO or general manager decides whether a licensing discussion fits, and counsel checks contractor agreements, customer data and any limits on sharing network information. For a cooperative, the board may also need to be informed.

The introduced company needs 50+ full-time employees at peak (contractors excluded), a documented operating history, rights to license the records, and an authorized contact. Companies in the U.S., Canada and the EU qualify, as do companies in the UK, Australia, New Zealand, India, Singapore, South Africa, Latin America, the UAE and Saudi Arabia when at least 90% of the data is in English.

What stays unknown until SourceX reviews it: dataset demand for this record type, the rights review result, what must be removed or de-identified, and whether any offer follows. Partners sign the Channel Partner Agreement before submitting introductions, and the first valid introduction within the 90-day window is credited when the company submits a verified application. Related sectors are on energy and utilities and the industries hub.

Go deeper on outage work order verification

Next step

Refer a company. Earn up to $100,000. Default reward: 25% of Actual Supplier Payout, capped at $100,000 cumulatively per referred company. Eligibility and payment conditions apply, and a signed Schedule A or addendum can differ. A lead, meeting or signature alone does not trigger payment.

If a client's outage platform migration could leave years of verified restorations and nested events behind, register as a partner, check the company against who qualifies, and read the program terms before you send the handoff.

  1. Step 1Share your linkSend your personal link to a company you know.
  2. Step 2Company appliesThe company applies itself at /apply.
  3. Step 3Company signs and is paidThe company signs, delivers its data and is paid by SourceX under its agreement.
  4. Step 4You get your rewardYour 25% of the actual supplier payout. A reward becomes payable after SourceX has paid the referred company under its signed agreement and the payout conditions in the program terms are met, including finance approval and your tax and payment details.

Common questions

Can a utility contractor license outage records from work it did for a utility?

Only what its contract with that utility allows. Restoration logs and crew records may belong to the contractor, the utility or both, so counsel and SourceX's rights review decide. Utility contractor private equity covers the contractor side.

Do outage records contain personal data?

Often: fault reports and callbacks carry customer names, addresses, phone numbers and account numbers, and meter data is tied to premises. Those fields are excluded or de-identified as rights review requires. Network location data may also be treated as security-sensitive.

Is the migration date a reason to rush an introduction?

It is a real reason to raise the question early, because history the new system does not import may become hard to read. It is not a reason to pressure anyone, and keeping data is the company's decision under its own retention rules.

Sources

  1. eia.gov/survey/form/eia_861/instructions.pdf
  2. docs.oracle.com/en/industries/energy-water/network-managemen…
  3. cmte.ieee.org/pes-drwg/wp-content/uploads/sites/61/2003-01…
  4. refer.sourcex.si/terms

Free resources

Know a company with valuable proprietary data?

Become a referral partner, get your link and introduce the company’s CEO (in an owner-run company, usually the owner). Referral partners can join from most countries. We can't work with partners in countries or regions under U.S. sanctions or on U.S. restricted-party lists. The companies you introduce should be based in the U.S., Canada and the EU, or in the UK, Australia, New Zealand, India, Singapore, South Africa, Latin America, the UAE and Saudi Arabia with at least 90% of their data in English.

Refer a company →

I own a business

Explore licensing your company's data directly to SourceX for AI training and evaluation. Start a short assessment; no uploads needed.

Start an assessment