Who can authorize licensing outage restoration records? A decision tree for utility asset consultants

Short answer

Start with the operations director, who runs outage response and can say which records survive, then bring in the CEO, who can approve a licensing discussion, with counsel setting limits, and at a cooperative or municipal utility often the board or council as well. Dispatchers, system operators and platform administrators create and store the records, but none of them can authorize licensing them. Customer-linked fields, network details and contractor logs take side branches that counsel and SourceX's rights review settle.

Visual briefFull-size diagram
A top-down tree: dispatchers and administrators sit in a grey access-only band; the operations director is the sponsor; a diamond asks what kind of utility it is, and the lit path runs to the CEO, with a branch to board or council approval for cooperatives and municipal utilities and side branches for customer-linked fields and contractor logs.
The green path is the usual introduction. Amber branches are settled by counsel, the utility's own governance rules and SourceX's rights review.

The tree belongs to the outage work order verification guide. Use it once you know a utility kept its verified restorations, to decide whose yes matters.

Access is not authority: the people around an outage event

Many people touch an outage record. Few can commit it. Sort the roles before asking anyone for anything.

RoleWhat they can do with the recordsAuthority over licensing
Dispatchers and system operatorsCreate, update and close events and crew assignmentsNone
Outage platform administratorKnows what is stored, for how long and what exportsNone
Asset system administratorKnows how work orders link to events and assetsNone
Metering managerKnows meter event retentionNone
Operations directorOwns the restoration process; can describe coverageSponsor, rarely final
CEODecides on company data and contractsYes; authorizes and signs
General counsel or records managerReads contracts, privacy and security obligationsSets the limits

The administrators are worth naming in a brief because they make it accurate. They are not the introduction.

Decision points, in order

Walk down the tree. The introduction is whoever first answers yes at point 4, with whatever approval point 5 adds.

  1. Is this person on the operations floor or a system administrator? They describe records. Ask who owns outage response.
  2. Does this person own outage response? Usually the operations director, sometimes a vice president of operations. Ask them to sponsor, to bring in the CEO, and to say whether a platform change is planned.
  3. What kind of utility is it? Investor-owned, cooperative or municipal. This decides who stands behind the CEO.
  4. Can this person commit utility records to an agreement? The CEO, whether the utility is investor-owned, cooperative or municipal, or the company is a contractor; at a cooperative or municipal utility the chief executive is often titled general manager. Introduce them.
  5. Does a board, council or parent need to approve or be told? A cooperative may need its board under its own bylaws; a municipal utility may answer to a council or utility board; a subsidiary may need its parent. The CEO knows which.

How the signer changes by ownership type

QuestionInvestor-owned utilityElectric cooperativeMunicipal utilityUtility contractor
Who holds the outage records?The utilityThe cooperativeThe city or its utility boardContractor or its client, by contract
Who sponsors?Operations directorOperations managerUtility operations directorStorm or field operations lead
Who can say yes?CEO, often with a parent-company officerCEO (often titled general manager)CEO (often titled general manager or utility director)CEO
Who else may need to approve?Parent companyBoard, under the bylawsCouncil or utility board, under local rulesThe utility client, for its records
Typical counsel concernCustomer and network dataMember dataPublic records rules and customer dataClient contract terms

Contractors are a distinct case: restoration logs created during storm work may be the contractor's, the utility's or both, depending on contract. The page on utility contractor private equity covers how those businesses are owned.

Where counsel, the board or a client contract signs off

Three branches turn amber, and the partner stops at each.

Customer-linked fields. Trouble calls, callbacks and meter events tie outages to named premises and accounts. Counsel decides what is excluded or de-identified, under the utility's privacy obligations and any customer data rules that apply to it.

Network information. Device locations and feeder topology can be treated as security-sensitive. Counsel decides whether event histories need network fields generalized or removed. Insurance terms sometimes bear on this too; see data licensing and cyber insurance coverage.

Reported figures. Utilities report reliability indices from these same interruption records; Form EIA-861 collects SAIDI and SAIFI including and excluding major events. Licensing does not change what was filed, but counsel may want to know which reporting years a dataset spans.

The outage platform's own structure decides how much of the restoration story is there to discuss at all; Oracle's Network Management System user guide, for instance, covers related partial restoration events. The worked exception case shows what that structure captures.

What stays unknown until SourceX's rights review

When the right executive agrees to talk, nobody yet knows:

  • Scope: which years, event types and systems can be included once contracts and governance are checked.
  • Exclusions: which customer-linked and network fields must be removed.
  • Demand: whether AI labs and data users want verified restoration histories when SourceX reviews them.
  • Terms: whether an offer follows.

The utility needs 50+ full-time employees at peak (contractors excluded), documented operating history, rights to license and an authorized contact. Companies in the U.S., Canada and the EU qualify, as do companies in the UK, Australia, New Zealand, India, Singapore, South Africa, Latin America, the UAE and Saudi Arabia when at least 90% of the data is in English. SourceX licenses approved business data directly from companies for AI training and evaluation and manages the agreement, rights review, data preparation, delivery and payout. Partners sign the Channel Partner Agreement before submitting; the first valid introduction within the 90-day window is credited when the company submits a verified application, with one partner per company.

Why data rights matter explains what the review establishes. Record the sponsor and signer in the outage verification referral brief. For another verification workflow where authority and access diverge, see vendor bank account change verification. Sector pages: energy and utilities and the industries hub.

Next step

Refer a company. Earn up to $100,000. Default reward: 25% of Actual Supplier Payout, capped at $100,000 cumulatively per referred company. Eligibility and payment conditions apply, and a signed Schedule A or addendum can differ. A lead, meeting or signature alone does not trigger payment.

Once the operations director has named the CEO and said whether a board or council must be involved, register as a partner, check the utility on who qualifies and read the program terms before you introduce them.

  1. Step 1Share your linkSend your personal link to a company you know.
  2. Step 2Company appliesThe company applies itself at /apply.
  3. Step 3Company signs and is paidThe company signs, delivers its data and is paid by SourceX under its agreement.
  4. Step 4You get your rewardYour 25% of the actual supplier payout. A reward becomes payable after SourceX has paid the referred company under its signed agreement and the payout conditions in the program terms are met, including finance approval and your tax and payment details.

Common questions

The outage platform administrator offered to help. Is that enough?

It is helpful, not sufficient. The administrator can confirm which events, links and checks are stored, which makes the brief accurate. Authority to discuss licensing utility records sits with the CEO (at many cooperative and municipal utilities the chief executive holds the title of general manager), often with the board or council informed.

Does a cooperative's board have to approve a data licensing discussion?

It depends on the cooperative's bylaws and policies, which this page cannot read. Many cooperatives keep the board informed of contracts of this kind; the CEO will know whether approval or only notice is needed.

Can a utility contractor license restoration logs from storm work?

Only what its contract with the utility client allows. The logs may belong to the contractor, the client or both, so counsel reads the contract and SourceX's rights review confirms it.

Sources

  1. refer.sourcex.si/terms
  2. eia.gov/survey/form/eia_861/instructions.pdf
  3. docs.oracle.com/en/industries/energy-water/network-managemen…

Free resources

Know a company with valuable proprietary data?

Become a referral partner, get your link and introduce the company’s CEO (in an owner-run company, usually the owner). Referral partners can join from most countries. We can't work with partners in countries or regions under U.S. sanctions or on U.S. restricted-party lists. The companies you introduce should be based in the U.S., Canada and the EU, or in the UK, Australia, New Zealand, India, Singapore, South Africa, Latin America, the UAE and Saudi Arabia with at least 90% of their data in English.

Refer a company →

I own a business

Explore licensing your company's data directly to SourceX for AI training and evaluation. Start a short assessment; no uploads needed.

Start an assessment