Laboratory system replacement archive context checklist: three milestones before the legacy system goes dark

Short answer

Work through three milestones in order: before the replacement is announced, before cutover to the new LIMS, and before the legacy system is switched off. At each one, confirm whether initial results, authorized corrections and released versions stay identifiable and linked, name the person who owns each answer, and note what is lost if the item is skipped. Every date on the timeline comes from the lab's own validated plan, not from an assumption.

Visual briefFull-size diagram
A vertical countdown with three milestones, announcement, cutover and old LIMS shutdown, each ticking off checklist items about the audit trail before the legacy server switches off.
The countdown to legacy LIMS shutdown. Dates come from the lab's own validated plan, never from an assumption.

This checklist is part of the laboratory system replacement guide, which explains why corrected-result provenance matters. This page is the follow-through: a dated record of who confirmed what, kept current until the old server is gone.

Setting the clock before you tick anything

A countdown is only useful if its end point is real. Write down the three milestone dates as the lab has documented them, and who owns each, before any item gets a tick.

MilestoneWhere the date normally comes fromIf there is no date yet
AnnouncementThe project charter, the vendor contract or the lab director's notice to staffThe checklist is early; work through milestone one without pressure
CutoverThe validation plan and go-live schedule for the new platformRecord who owns the go-live decision
Legacy shutdownA server retirement ticket, a license end date or the IT decommissioning planLeave it blank; the item becomes "find out who decides"

Give each item one of three marks. Confirmed means a person with authority said so. Open means nobody knows yet, with a named person to find out. At risk means the current plan loses it. A screenshot of a configuration screen is not confirmation; a quality manager's answer is.

Keep the sheet yourself, one row per item, and share it only with the people who answered. It records configuration and ownership, never content: no sample IDs, values, client names or report copies.

Milestone one: before the replacement is announced

This is the cheapest moment to ask. Nothing has been decided about legacy history, and nobody is yet defending a migration scope.

ConfirmOwnerIf skipped
The legacy system records a first-entered value with timestamp and analyst for each resultSystem administratorLater nobody can say whether first entries were ever kept
Corrections carry a reason, the person who changed it and the approverQuality managerThe history shows that values changed but not why
Which regulatory regimes apply, and which only need accreditation rulesQuality managerThe archive is sized to the wrong retention period
Who owns results versus methods, specifications and review notesLab director, with counselRights questions surface only after an introduction

The regimes matter because they shape what already exists. FDA's electronic records rule (section 11.10(e)) requires secure, computer-generated audit trails in which a change leaves the earlier entry readable. The nonclinical lab rule (section 58.130(e)) adds a stated reason and a date for each change. A lab working under either regime usually has the linked history; the question is whether the migration will keep it.

Milestone two: before cutover to the new platform

Once the field mapping is signed off, the legacy audit trail starts to look like a problem for later. These items protect the link between versions, not just their existence.

ConfirmOwnerIf skipped
The migration scope says whether audit trails move, are archived or are droppedProject leadOnly current values load, and nobody notices for months
Migration validation checks meaning as well as valueValidation leadA clean final number hides that it was ever corrected
Amended reports stay linked to the originals they replacedSystem administratorReleased versions can no longer be traced to their corrections
An audit-trail export keeps sample and result IDs, not just a PDF per batchSystem administratorThe export exists but cannot be joined back to results

EU GMP Annex 11, where it applies, expects migration validation to confirm that data are not altered in value or meaning. That is the most useful sentence to quote in a scope meeting. Ask the validation lead whether their test scripts look at correction history at all, or only compare final values.

A three-row check worth running once

Illustrative. A 310-person environmental testing lab plans to load each result's current value into a hosted platform. Before cutover, its system administrator follows one lead result on a drinking water sample through the migration plan:

VersionWhat the plan does with itMark
First entry, 18 ppb, from the instrument runLeft in the legacy database, which is scheduled for deletionAt risk
Approved change to 12 ppb after a dilution factor was corrected, signed by the section supervisorExported as a batch audit report without result IDsAt risk
Reported value, 12 ppb, on the issued reportLoaded to the hosted platformConfirmed

Two at-risk marks on one trace tell the lab exactly what to fix while it still can. They also tell you that the history is real, linked today and worth a conversation.

Milestone three: before the legacy system is switched off

Shutdown is final. Items still open here are usually lost for good, so this milestone is about access and authority rather than mapping.

ConfirmOwnerIf skipped
Where the archived audit trail will live: read-only database, export or vendor archiveIT managerThe history exists but nobody can open it
The archive stays readable for the full retention periodQuality managerFiles survive in a format no one can read
Retention covers corrected reports for at least the CLIA minimum, where CLIA appliesQuality managerCorrected reports are deleted with the server
Who can authorize a licensing discussion about the archiveOwner, CEO or designated executiveAn interested lab has nobody able to say yes

The clinical lab retention rule (section 493.1105) names final, preliminary and corrected reports among records a lab must keep or be able to retrieve for at least two years. Annex 11 also expects access to be ensured throughout the retention period. An archive is not a backup, so ask which one the plan describes. Labs moving off a home-built database face the same choice; the legacy Access database page covers that case, and the ERP replacement handoff checklist shows the equivalent for finance systems.

Reading the finished timeline

When all three milestones are marked, read the sheet back to the owner as one sentence per version: initial results, corrections and released versions, each confirmed, open or at risk, plus the earliest year in the legacy system. That summary is a complete metadata-level description. It answers the core question without a single result leaving the lab.

If the owner wants to explore licensing, three things follow.

Disclose. Tell the owner you are a SourceX referral partner and may receive a reward if a qualifying license completes. SourceX funds it separately and never deducts it from the lab's payout. SourceX licenses approved business data directly from companies for AI training and evaluation, and manages agreement, rights review, data preparation, delivery and payout.

Check fit. The lab needs 50+ full-time employees at peak (contractors excluded), a documented operating history, rights to license the records, and an authorized contact. Companies in the U.S., Canada and the EU qualify, as do companies in the UK, Australia, New Zealand, India, Singapore, South Africa, Latin America, the UAE and Saudi Arabia when at least 70% of the data is in English. Client-owned results usually need client consent, so the lab's own methods and correction workflow are the likelier starting point. Buyer need, the rights review and any offer stay unknown until SourceX reviews the application.

Introduce. Sign the Channel Partner Agreement first, then use the annotated introduction email for lab directors. The first valid introduction within the 90-day window is credited when the company submits a verified application. Illustrative only: a $250,000 qualifying payout to the lab would mean a $62,500 default reward. The rewards page lists every condition, the testing laboratory fit page covers which lab records are strongest, and what data provenance means explains why linked versions matter.

Next step

Refer a company. No cap on rewards. Default reward on a company's first qualifying transaction: the greater of $50,000 plus 5% and 15% of Actual Supplier Payout, with no cap; further qualifying transactions first agreed within 12 months of the first Closing pay 15%. Eligibility and payment conditions apply, including the USD 100,000 Minimum Transaction, and a signed Schedule A or addendum can differ. A lead, meeting or signature alone does not trigger payment.

If the timeline shows the lab's correction history survives shutdown and the owner wants to talk, register as a partner, confirm who qualifies, and read the program terms before you introduce anyone.

  1. Step 1Share your linkSend your personal link to a company you know.
  2. Step 2Company appliesThe company applies itself at /apply.
  3. Step 3Company signs and is paidThe company signs, delivers its data and is paid by SourceX under its agreement.
  4. Step 4You get your rewardthe greater of $50,000 plus 5% and 15% of the actual supplier payout, with no cap. A reward becomes payable after SourceX has paid the referred company under its signed agreement and the payout conditions in the program terms are met, including finance approval and your tax and payment details.

Common questions

What if the lab has not set a shutdown date for the legacy LIMS?

Leave the third milestone open and record who will decide it. Never put a date of your own on the timeline; an assumed deadline is pressure the lab has not agreed to.

Should the consultant run the audit-trail export?

Only as part of the paid migration work the lab commissioned. For the referral side, the consultant records answers at metadata level and never handles results or reports.

Does a completed checklist mean the lab qualifies?

No. It describes what the lab holds and who controls it. Eligibility, rights and any offer are decided after the lab applies and SourceX reviews it.

Sources

  1. health.ec.europa.eu/system/files/2016-11/annex11_01-2011_en_0.pdf
  2. ecfr.gov/current/title-21/chapter-I/subchapter-A/part…
  3. ecfr.gov/current/title-21/chapter-I/subchapter-A/part…
  4. ecfr.gov/current/title-42/chapter-IV/subchapter-G/par…
  5. refer.sourcex.si/terms

Free resources

Know a company with valuable proprietary data?

Become a referral partner, get your link and introduce the company’s CEO (in an owner-run company, usually the owner). Referral partners can join from most countries. We can't work with partners in countries or regions under U.S. sanctions or on U.S. restricted-party lists. The companies you introduce should be based in the U.S., Canada and the EU, or in the UK, Australia, New Zealand, India, Singapore, South Africa, Latin America, the UAE and Saudi Arabia with at least 70% of their data in English.

Refer a company →

I own a business

Explore licensing your company's data directly to SourceX for AI training and evaluation. Start a short assessment; no uploads needed.

Start an assessment