# Manufacturing company due diligence checklist

Canonical: https://refer.sourcex.si/resources/manufacturing-company-due-diligence-checklist
Last updated: 2026-10-20

A manufacturing company due diligence checklist covers customers and programs, equipment, quality systems, ERP and supply chain. Advisors should add a records pass that separates customer-owned drawings and specifications from the manufacturer's own quoting, quality and process records, since only the latter could be considered for an AI data license.

## What belongs on a manufacturing company due diligence checklist?

A manufacturing checklist covers customers and program concentration, equipment and facilities, quality systems, supply chain, ERP and cost data, and people. The addition for advisors who also think about data licensing is a seventh section that separates what the customer owns from what the manufacturer created itself.

That split matters because a plant lives on other people's information. Customer drawings, specifications and tooling data sit next to the manufacturer's own quotes, routings, quality records and scheduling decisions. Only the second group is the manufacturer's to license.

## Customers, programs and contracts

Rank customers by gross margin contribution, then by program life. A plant that makes one part family for one OEM is a different risk from a job shop with a hundred small accounts.

- [ ] Sales by customer and by part family for several years, with margin after material and direct labor
- [ ] Supply agreements, purchase order terms, long-term agreements and price-adjustment clauses
- [ ] Program awards, expected end-of-life dates and pending requotes
- [ ] Tooling ownership: which dies, molds and fixtures belong to the customer and which to the plant
- [ ] Change-of-control and assignment language in customer agreements
- [ ] Warranty, returns and chargeback history by customer
- [ ] Open requests for quote and win-loss history

Concentration analysis lives in its own guide, [customer concentration in M&A](/guides/customer-concentration-m).

## Equipment, facilities and capacity

| Item | What the buyer asks for | Why it matters |
|---|---|---|
| Fixed asset register | Equipment list with age, make, model, hours and location | Drives valuation of the asset base |
| Maintenance records | Preventive maintenance logs, downtime by machine, major repairs | Shows deferred maintenance |
| Capacity | Utilization by cell or line, shift pattern, bottleneck operations | Tests growth claims |
| Real estate | Owned or leased, lease terms, environmental reports | Often carved out and negotiated separately |
| Capital plan | Committed spend, overdue replacements | Affects the normalized cash flow |

A site visit is where equipment claims get checked. The [M&A site visit preparation checklist](/resources/m-and-a-site-visit-preparation) covers what a seller should have ready on the floor.

## Quality systems, certifications and compliance

- [ ] Quality manual, procedures and the most recent third-party audit results
- [ ] Certifications held and their expiry dates, such as ISO 9001 or industry variants
- [ ] Customer scorecards, corrective action requests and the closure record
- [ ] Scrap, rework and first-pass yield trend by line
- [ ] Safety program, incident logs and open citations
- [ ] Environmental permits and any open notices
- [ ] Export-control and customer security flow-downs where the plant makes controlled parts

This is general information, not legal, tax or financial advice. Which certifications and permits apply depends on the products and customers, so deal counsel and the buyer's operating team confirm the list.

## ERP, costing and supply chain

The ERP is the plant's memory. Buyers use it to test whether standard costs match reality.

- [ ] ERP vendor, version, customizations and the date of the last major upgrade
- [ ] Bills of material, routings and standard versus actual cost variances
- [ ] Inventory valuation method, reserve policy and cycle count accuracy
- [ ] Supplier list with spend by supplier and single-source parts
- [ ] Purchase price variance trend and open commitments
- [ ] Work-in-process aging and obsolete inventory review

The same ERP is the most useful system when licensing is on the table, because it links quotes, orders, production and shipments in one structure.

## Which records are the manufacturer's own, and which belong to customers?

Use a three-bucket sort before anyone talks about licensing.

| Bucket | Examples | Posture |
|---|---|---|
| Customer-owned | Drawings, CAD models, specifications, customer test data, tooling data | Excluded unless the customer consents in writing |
| Shared or unclear | Engineering change requests, first-article reports, corrective action threads | Review the supply agreement and any confidentiality clause |
| Manufacturer-created | Quotes and cost build-ups, routings and process notes, scheduling decisions, quality investigations, maintenance logs, supplier negotiations | Candidates for a license after review |

Manufacturers with outcomes attached to those records are the interesting ones: a quote that was won or lost, a nonconformance that was closed with a root cause, a schedule change that was approved. Those are multi-step decisions with results.

## How to run the extra records pass

1. Ask the operations or IT lead to list the systems in use (ERP, MES, quality system, CRM, email, shared drives) and the years each covers.
2. Ask who can export from each one, and whether any legacy system was retired without an export.
3. Have the controller or general counsel flag customer agreements that restrict use of non-public information.
4. Check headcount against the [who qualifies](/who-qualifies) baseline: 50+ full-time employees at peak (contractors excluded), several years of documented operations, rights to license, and an authorized sponsor.
5. Run the [company fit checker](/tools/company-fit-checker) for a preliminary, non-binding screen.

Headcount is the first test, and rights over the drawings are often the limiting factor after it.

## Red flags

- Most engineering content is customer-owned and the customers have not agreed
- The plant is a captive operation inside a larger group whose records are controlled elsewhere
- Government or customer security rules restrict handling of the data
- The ERP was replaced and the old one wiped
- The owner will not consider an exclusive license

Staffing-led businesses have a different shape, which the [staffing agency due diligence checklist](/resources/staffing-agency-due-diligence-checklist) covers. For the buyer-side view, see [how to build an M&A buyer list](/guides/how-to-build-a-buyer-list-m) and, if you plan to circulate this list in a professional group, [how to share a company referral checklist in a professional community](/guides/how-to-share-a-company-referral-checklist-in-a-professional-community).

## How partner rewards work for an advisor

Partners earn the greater of $50,000 plus 5% and 15% of the compensation SourceX actually pays the company you refer, with no cap. A reward becomes payable after SourceX has paid the referred company under its signed agreement and the payout conditions in the program terms are met, including finance approval and your tax and payment details. The reward is calculated on the actual supplier payout, never deducted from what the company receives. Licensed advisors should check their own rules on referral fees and client disclosure; see the [program terms](/terms) and [referral opportunities for M&A advisors](/for/m-and-a-advisors).

## Next step

Add the three-bucket sort to your next manufacturing mandate. If the plant clears it, [register as a partner](/register) and make the introduction, or have the owner apply at [sourcex.si/apply](https://sourcex.si/apply) with your referral link.
